MISys SAE Manufacturing System - Level 2
 |
When the time is right, move up to Level 2, which adds production control,
master production scheduling (MPS), and material requirements planning (MRP)
capabilities. |
Create Manufacturing Orders
- Create manufacturing orders based on standard bills of
material.
- Create manufacturing orders directly from
Advantage sales orders.
- Associate jobs with manufacturing orders for detailed cost
analysis.
- Edit manufacturing orders to create custom job orders.
- Allocate special items such as labor, supplies, and tooling
to customize manufacturing order.
- Attach word processing files to provide unlimited amounts of
online documentation.
- Attach pictures (all popular formats supported).
- Create and link child manufacturing orders to any parent
manufacturing order.
- Copy previous orders to speed up amending order generation.
- Print internal manufacturing order approvals and multi-page
production manufacturing orders and travelers.
- Analyze standard, projected, and actual job costs with
performance variances.
- Create detailed manufacturing order pick lists.
- Pick partial or complete manufacturing orders.
- Complete support for Stock, WIP, and Reserve stock with
automatic backflush.
- Back-flush complete or partially completed manufacturing
orders.
- Automatically adjust raw materials based on actual
production yield.
- Special handling of non-backflush type items.
- Record scrap resulting from specific manufacturing order
processing.
- Expedite and close manufacturing orders at any time with
automatic cleanup of partially committed material.
- Transfer completed items directly to
ACCPAC finished goods inventory.
Produce Master Production Schedules
- Create a Master Production Schedule (MPS) for any planning
horizon.
- True bucketless scheduling with user-defined period number
and size.
- Save and re-open multiple production schedules.
- Maintain a pool of active production schedules.
- Share production schedules among MISys/2000 workgroup users.
- Include or ignore current inventory, purchase order, and
manufacturing orders in MPS.
- Create and maintain batches of scheduling events.
- Fix production start dates and schedule forward to
completion.
- Fix production completion dates and schedule back to start.
- Apply batches to MPS to simulate planned purchasing and
production activity.
- Retrieve and schedule sales orders from Order Entry.
- Instantly spotlight shortages of raw materials and
sub-assemblies.
- View master production schedule for all items, or items
meeting specific stocking criteria.
- Drill down master production schedule to view item schedule
on period-by-period basis.
- Drill down item schedule to view current and planned
activity.
Analyze Material Requirements Plans
- Base material requirements on zero, minimum, or reorder
points.
- Create Material Requirements Plan (MRP) based on results of
MPS.
- Print detailed Purchasing Advice Report to show items which
must be purchased in order to satisfy MPS.
- Purchasing Advice Report identifies available suppliers and
suggests expediting existing purchase orders where appropriate.
- Print detailed Production Advice Report to show items which
must be built in order to satisfy MPS.
- Production Advice Report suggests expediting existing
manufacturing orders where appropriate.
- Create purchase orders based on quantities and dates
indicated by MRP.
- Create production manufacturing orders based on quantities
and dates indicated by MRP.
- Print MRP reports showing activity for all periods, active
periods only, or net activity per item.
Note: A Test Drive copy of Level 2 and Level 3 is included with every copy of
MISys Level
1. We invite you to explore this functionality using your own familiar data
before making a decision to license this software. |
|